Page 1 of 1

However, with such a plan, the deadline seems very long

Posted: Sat Feb 22, 2025 9:51 am
by hasan018542
After a few months, you may find that the progress in the front is not ideal, and there is not enough time to complete the 100,000 words in the back, which will eventually lead to a big delay.

On the other hand, if I think from the perspective of "what results can be produced in the short term", I will design "to organize the existing ideas and materials into an outline with complete details within a week" , and then produce a draft outline after a week. Then I saw that the first chapter in the outline already had basic information, belgium mobile database so I planned to "complete the draft text of the first chapter in one week."

As a result, I found that there was still a lack of analysis of some key methodologies, so the next week I designed a plan to "complete the comparative analysis of the four relevant methodologies in one week" so that I could continue to advance the next key results needed in the short term.

With the latter method, after perhaps four or five short-term results, about a month later, the structural details and draft materials of the book will have been successfully produced.

Let the project progress to a state where I have the basic results of the project and can attack or defend.